Photos

Rectifier upgrade paying off for Hypervelocity Tunnel 9

Members of the Tunnel 9 team are pictured with the electrical rectifier unit recently put into use. The unit, which was first delivered and installed in 2011, will replace an approximately 50-year-old power unit at Tunnel 9. Pictured from left are Electrical/System Engineer Tao Lee, Controls Engineer/Lead Controls Technician Ray Schlegel, Lead Electrician Ed Tierney, Chief Facility Engineer Nick Fredrick, Electrical/Data System Engineer Joel Barr and Test & Evaluation Engineer Inna Kurits.

PHOTO BY: Arnold Collier
VIRIN: 180322-F-BK283-725.JPG
FULL SIZE: 2.26 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.