The Department of Air Force (DAF) is moving forward with plans to host Artificial Intelligence (AI) data centers on underutilized land at select Air Force bases through a lease of property. This effort is a response to Executive Order 14179: Removing Barriers to American Leadership in Artificial Intelligence dated 23 January 2025, and Executive Order 14318: Accelerating Federal Permitting of Data Center Infrastructure dated 23 July 2025. On 15 October 2025, a solicitation was released stating the DAF is seeking qualified entities for a long-term lease to develop and operate these data centers, supporting innovation and technological advancement. This list of Frequently Asked Questions (FAQs) provides answers to anticipated questions and concerns about this process.

QUESTIONS & ANSWERS
Who will own and operate the data centers built on Air Force land?
The AI Data Centers will be owned by private entities selected from a competitive process. These private entities, who will lease the real property from DAF, are responsible for financing, constructing, operating and maintaining the Data Centers.

How does the DAF benefit from this initiative?
In consideration of leasing its land, the DAF will receive cash and/or in-kind consideration of monetary value. Additionally, at installations where a developer proposes a dedicated energy source for a Data Center, the DAF is requiring first right of refusal of power during a grid outage. Any power the installation obtains from the developer will be negotiated separately.

Which installations were selected for this opportunity?
The DAF offered land for AI Data Center development at five installations: Arnold AFB, TN, Edwards AFB, CA, Joint Base McGuire-Dix-Lakehurst (JBMDL), NJ, Davis-Monthan AFB, AZ, and/or Robins AFB, GA. The DAF selected these installations based on market analysis, infrastructure availability, and strategic importance. The DAF may consider other installations in the future.

What Government missions are expected to be hosted on these data centers or require on-premise data centers at this scale and size?
AI Data Centers at DAF installations are not meant to primarily support mission data requirements but will primarily support commercial use. The DAF is neither requiring nor guaranteeing DAF use of any on-site AI Data Centers proposed in response to this solicitation. Although not currently contemplated, if the owners were to successfully market utilization of an on-base AI Data Center to a DAF customer, this would be a separately negotiated agreement by the associated DAF component outside of the lease transaction.

Can you tell us how energy and water usage will be factored into the evaluation of these proposals, to include potential impacts on the availability of those resources both to the installation and surrounding communities?
Data centers can utilize substantial energy and water. The Request for Lease Proposal (RFLP) requires offerors to provide a mitigation and contingency plan to ensure the installations and surrounding communities’ utilities service life, resiliency, and capacity are not impacted. Offerors must also address site specific energy markets and other factors such as Regional Transmission Organizations and Independent Systems Operators conditions based on the project development location. For regulated utility markets, the offerors are required to identify how the project will be supported by local electric, gas, communication network and water utilities. Additional coordination will be required for deregulated utilities. Water efficient technologies are of heightened interest.

Have state and local governments and utilities been informed of these potential leases as the data centers could have impacts on both energy/water availability and costs for surrounding communities?
The DAF is requiring offerors to demonstrate in their proposals how they would minimize and mitigate impacts and risk to the surrounding community, specifically related to the access to and affordability, reliability, and quality of energy, water, and communication bandwidth. Offerors will also be required to demonstrate how their proposal will be compatible with the surrounding community; minimize environmental, cultural, and infrastructure impacts; be consistent with best commercial practices; and support positive relations with State and local government authorities and the communities adjacent to the properties. Once best value lease applicants at different sites are selected, the DAF will ensure appropriate National Environmental Policy Act (NEPA) and other required regulatory reviews are properly accomplished before entering into a lease.

Will there be an EIS required if we move forward?
The DAF will require compliance with the National Environmental Policy Act (NEPA) and other applicable laws. The NEPA requirements will be assessed once the DAF approves the preliminary scope of work, proposed by the selected applicant at each location, is sufficiently developed and prior to lease closing.

Will projects less than 100 MWs of compute capacity be considered?
Given the realities of utility capacity constraints and onsite generation development timelines, phased projects will be considered as long as they are structured to reach or surpass 100 MWs of capacity in a reasonable timeframe. The DAF is interested in large-scale developments and would like to see good faith bids which provide a roadmap for phased development if appropriate.

Will construction tradesmen and eventual data center operators be required to go through base security daily and be subject to respective background checks?
DAF will make every effort to work with the eventual lessee to establish a new perimeter (move the fence) to provide site access separate from installation security if feasible. However, if that is not feasible given the location of the respective parcels, then personnel associated with the data center development will be required to meet installation security requirements.

LANDING GEAR TEST FACILITY

Overview

The Landing Gear Test Facility (LGTF) has been a cornerstone of aerospace testing at Wright-Patterson Air Force Base since 1942, dedicated to ensuring the reliability and performance of aircraft landing gear systems.

Throughout its history, the LGTF has supported the warfighter by providing critical data to enhance the safety and effectiveness of landing gear, wheels, tires, and brakes, directly contributing to the mission of the United States Department of Defense. In addition to its military focus, the LGTF offers comprehensive testing services to commercial entities, employing world-unique test machines capable of simulating real-life conditions with unparalleled accuracy.

Guided by the core values of IntegrityService, and Excellence, the LGTF consistently delivers precise and dependable data to both military and commercial partners.

Test Machine Capabilities

 

 Overall System Specifications:

Max Speed: 250 mph
Max Acceleration: 21 ft/s2
Inertial Equivalent: 2,445 - 20,063 lbs.
Max Kinetic Energy: 41,750,000 ft-lbs.

 

South Carriage Specifications:

Max Load: 40,000 lbs.
Max Torque: 375,000 in-lbs.
Max Tire Size: 64 in

 

North Carriage Specifications:

Max Load: 25,000 lbs.
Max Torque: 72,000 in-lbs.
Max Tire Size: 48 in

Overall System Specifications:

Max Speed: 350 mph
Max Acceleration: 24 ft/s2

South Carriage Specifications:

Max Load: 150,000 lbs.
Max Yaw: ± 20°
Max Camber: ± 20°

North Carriage Specifications:

Max Load: 100,000 lbs.

 

Overall System Specifications:

Max Speed: 200 mph
Max Acceleration: 2 ft/s2
Inertial Equivalent: 10,147 - 162,987 lbs.
Max Kinetic Energy: 205,000,000 ft-lbs.

South Carriage Specifications:

Max Load: 301,500 lbs.
Max Brake Torque: 5,800,000 in-lbs.

Overall System Specifications:

Max Speed: 250 mph
Max Acceleration: 16 ft/s2
Max Vertical Load: 150,000 lbs.
Max Yaw: ± 20°
Max Camber: ± 10°

Overall System Specifications:

Max Compressive Load: 3,000,000 lbs.
Max Tension Load: 1,000,000 lbs.
Max Stroke: 60 in
Max Height: 28 ft
Max Width: 10 ft
Platen Size: 60.5 x 96 in

Overall System Specifications:

Max Vertical Load: 75,000 lbs.
Max Side Load: 30,000 lbs.
Max Yaw: ± 90°
Max Camber: ± 10°
Max Tire Size: 56 in.
Table Length: 20 ft.
Max Travel Speed: 3 in/s
Roll Distance: 217 in

 

Overall System Specifications:

Below-grade safety enclosure
Dimensions: 72 x 120 x 126 in.
Water Pressure Limit: 5,000 psi
Rate of Inflation: 10 psi/min

Drop Tower #1

Load Range: 750 - 3,600 lbs.
Wing Lift: 200 - 3,600 lbs.

 

Drop Tower #2

Load Range: 2,000 - 10,300 lbs.
Wing Lift: 200 - 10,300 lbs.

 

Drop Tower #3

Load Range: 6,500 - 50,000 lbs.
Wing Lift: 200 - 35,000 lbs.

 

Drop Tower #4

Load Range: 35,000 - 150,000 lbs.
Wing Lift: 200 - 150,000 lbs.

Load frame that accommodates multiple hydraulic cylinders to provide controlled forcing and operational stresses to test objects in all 6 axes.

Recent Articles

CONTACT US

704 TG/OL-ACL
Landing Gear Test Facility
1981 5th Street
Area B, Bldg. 31
Wright-Patterson AFB, OH 45433
(937) 255-9216
704.tg.olac@us.af.mil

 

WHERE TO FIND US

Contact Form

Contact Form

Reach out to us
You can enter up to 1000 characters

ContactFormDashboard

The template for this control has not been configured for use yet. You may change the template under the settings menu for this module.