Photos

ASTF marks 30 years since Initial Operational Capability

The installation of new stainless steel ducting and valves with associated hardware underway in 2006 from ETF C-Airside Plant to the J/T/SL test cells as part of the Propulsion Consolidation and Streamlining Program. The PC&S Program Phase V, completed in 2007, enabled AEDC to shut down the 1950s-era ETF B-Airside Plant and provide the initial capability for concurrent turbine engine sea level and altitude testing. These upgrades eliminated the past conditions of handling the rust generated with the carbon steel ducting. (Photo by David Housch)

PHOTO BY: David Housch
VIRIN: 060802-F-0000U-001.JPG
FULL SIZE: 0.99 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.