Coordination leads to safe and successful completion of maintenance projects
AEDC pipefitter Chris Shores, far left, and Wilbert Eppenger remove a manway to permit access into a 72-inch water line in the Engine Test Facility J-Cell area to repair a leak 100 feet down the buried pipeline. The repair was conducted during an 11-day electrical and water outage in early July. Two rescue personnel from Industrial Emergency Services, LLC, were present to provide emergency assistance if needed. (AEDC photo)
PHOTO BY:
Holly Peterson
VIRIN:
160703-F-0000U-002.JPG
FULL SIZE:
0.74 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.