Photos

Study during Arcs upgrade results in major cost avoidance for AEDC

AEDC electrical engineers Tony Acklen and Howard Frederick review the Mid-Pressure Arc Heater project plans for adding electrical loads to an existing Plenum Evacuation System substation transformer at AEDC. (U.S. Air Force Photo/Rick Goodfriend)

PHOTO BY: Rick Goodfriend
VIRIN: 160812-F-RS654-015.JPG
FULL SIZE: 1.62 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.