Photos

Rake fabricated at AEDC Model and Machine shop to be used for flow calibration at NFAC

AEDC craftsman Michael Money works on rake hardware at the AEDC Model and Machine Shop prior to the item being shipped to the National Full-Scale Aerodynamics Complex at the Ames Research Facility, California. The rake, which was fully fabricated at the machine shop at Arnold AFB, will be used this summer in the Phase II Flow Calibration of the 40-by-80 foot test section. The goal of the Phase II Flow Calibration is to characterize the 40-by-80 test section flow quality throughout the tunnel operational envelope and report the results. (U.S. Air Force photo/Rick Goodfriend)

PHOTO BY: Rick Goodfriend
VIRIN: 170221-F-RS654-003.JPG
FULL SIZE: 1.33 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.