Photos

Combined effort achieves timely replacement of crane at AEDC Propulsion Wind Tunnel

This new 20-ton 20-202 bridge crane was installed at the Propulsion Wind Tunnel Facility to replace the original bridge crane, which was installed in the early 1950s. The AEDC Propulsion Wind Tunnel management, AEDC Test Operations and Sustainment contractor National Aerospace Solutions, the Arnold Air Force Base Contracting Office and the Arnold Civil Engineering Branch's SABER Contractor, SDVE, LLC, headed the acquirement of the new crane in an effort to avoid long downtime periods and impacts to PWT operations. (AEDC photo)

PHOTO BY:
VIRIN: 180312-O-F3405-002.JPG
FULL SIZE: 1.39 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.