Rectifier upgrade paying off for Hypervelocity Tunnel 9
The electrical rectifier at AEDC Hypervelocity Tunnel 9 is bolstering safety and the facility’s lifespan. The unit, which was first delivered and installed at Tunnel 9 in 2011, was recently put into use to replace an approximately 50-year-old power unit. (Courtesy photo)