Dr. Baker takes on new role as AEDC Test Operations Division Technical Director
Dr. Bill Baker’s first job at Arnold Air Force Base was in the AEDC Propulsion Wind Tunnel Facility. His first test as a project engineer was one conducted in the 16-foot supersonic wind tunnel, 16S. The object of that test was to measure the transition Reynolds Number of the tunnel and to measure the boundary layer on the walls of the tunnel at flows from Mach 2 to Mach 3. (U.S. Air Force photo)
PHOTO BY:
U.S. Air Force photo
VIRIN:
190122-F-F3405-001.JPG
FULL SIZE:
4.66 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.