Photos

Arnold AFB utilizes new tool in paving arsenal

Full depth reclamation, FDR, was recently used during a paving project at the parking lot of building 676 at Arnold Air Force Base, headquarters of Arnold Engineering Development Complex. After removing the asphalt, base civil engineers found that there was no subgrade. By using FDR, engineers were able to recycle a full thickness of asphalt pavement and a portion of the underlying materials to create a new, stabilized base layer. (U.S. Air Force Photo by Wayne Vandergriff)

PHOTO BY: Wayne Vandergriff
VIRIN: 240826-F-F3405-1001.JPG
FULL SIZE: 0.11 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.