News Search

  • Hypervelocity capabilities advance to new highs at AEDC Tunnel 9

    AEDC Hypervelocity Wind Tunnel 9 in White Oak, Maryland, is on the verge of delivering an unprecedented capability. In late April, the team at Tunnel 9 completed an initial shakeout of the Mach 18 system and, later this year, facility engineers are set to begin a full calibration on Mach 18. If

  • Tunnel 9 heater system expert passing along knowledge

    Mike Metzger holds a unique position in the world. A system engineer at AEDC Hypervelocity Wind Tunnel 9 in White Oak, Maryland, he is among a handful of people familiar with the Tunnel 9 heater system and the only system engineer ever assigned to it. The system is used to store and heat the

  • Tunnel 9 moves closer to 360-degree TSP capability

    The team at AEDC Hypervelocity Wind Tunnel 9 in White Oak, Maryland, has for some time considered a 360-degree capability for tests involving temperature-sensitive paint, or TSP, and has worked for about a year on ways to achieve it.Thanks to recent innovations developed after a customer’s need

  • AEDC Tunnel 9 team members taking initiative in STEM outreach

    AEDC supports many Science, Engineering, Technology and Mathematics (STEM) efforts throughout middle Tennessee impacting nearly 19,000 students in more than 60 schools since 2013 and has a program dedicated to STEM at Arnold Air Force Base.But the STEM efforts don’t stop in Middle Tennessee, the